Fill Out a Valid Peco Service And Meter Application Form

Fill Out a Valid Peco Service And Meter Application Form

The Peco Service And Meter Application form serves as a critical document for initiating electric service requests and meter installations or alterations within the PECO service area. This comprehensive form guides applicants through various requisite details, including personal information, service details, construction status, and technical specifications needed for PECO to process the request efficiently. It is mandatory for individuals or businesses seeking new connections, upgrades, or modifications to their electrical service.

Open Your Form Now

Applying for electric service and ensuring the proper installation of a meter can be a meticulous process, requiring the submission of a comprehensive form to initiate services. The Peco Service and Meter Application form, detailed with structured guidance, serves as a critical document for residents and businesses in regions covered by PECO. The form captures a wide array of information, starting with the applicant's identification details, including the requirement for a driver's license number or social security number, and progressing to technical specifications regarding the type of service request, such as new service installation, service upgrade, or demolition. It also outlines the specifics about the service location, customer billing address, and information from the electrician or contractor responsible for the work. Furthermore, it delves into the characteristics of the electric service required, metering information, heating and air conditioning details, and load characteristics, which help PECO assess and fulfill the electric service needs efficiently. Applicants must also indicate their current construction status and provide a projected date for when the service is needed. The form stresses compliance with PECO Electric Service Requirements and the necessity for an approved inspection, ensuring safety and regulatory adherence. It concludes with a section for the applicant's signature, cementing the commitment to proceed with the requested service under the terms outlined by PECO. By filling out this form, applicants initiate a process that enables PECO to analyze and respond to their service requests, aligning with the technical and infrastructural capacities of their location.

Document Example

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM

A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.

B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.

Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.

(**) Use the address of the service when applying for underwriter's inspection.

C.Complete the fields for customer's PECO billing address or account number (within last 60 days).

D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.

E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".

F. thru J. Indicate the following:

Type of Request

Type of Service (include number of units and area per unit)

Service Characteristics

Meter Information

Heating/Air Conditioning

K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.

L.Complete the table concerning motor information.

M.If compensated metering will be used, indicate totalizer and general load (KW).

N.Include any additional comments.

O.

Application MUST be signed and dated.

Forms Rev. 5/18

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA

 

 

 

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

 

 

 

COUNTY

 

 

 

1050 W. Swedesford Rd.

COUNTIES

 

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

830 S. Schuylkill Ave.

Berwyn, PA 19312

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

 

 

 

 

Philadelphia, PA 19146

Email:DelChesterServiceApplications@ex

Warminster, PA 18974

 

 

 

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Email:PhilaNewBusiness@e

eloncorp.com

 

 

 

 

 

 

 

Email:Bucksmontserviceapplications@e

Warminster, PA

18974

 

 

 

 

 

 

 

 

 

xeloncorp.com

 

 

 

Fax # (610) 725-1416

 

 

 

 

xeloncorp.com

 

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

Fax # (215) 731-2327

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

 

 

 

 

 

 

 

 

Tax ID # or SSN

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Separation of Wiring

Service Relocation

 

 

 

Service)

 

 

 

 

 

 

** ADDRESS TO BE SERVED

 

 

B

 

 

 

 

 

APARTMENT/LOT #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* If Applicable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

** Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

 

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

C

 

 

-OR-

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

 

3

 

 

120/240

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

3

 

 

120/208

 

 

 

4

 

 

 

 

CITY, STATE

 

 

ZIP CODE

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

 

 

 

3

 

 

277/480

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

 

 

 

3

 

 

13200

 

 

 

3 or 4

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

 

 

 

3

 

 

33000

 

 

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER INFO:

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

 

 

Multiple Meter Total No. _____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

Reply Requested by:

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

/

/

 

 

 

Central Air _____ Tons

 

Resistance

 

 

 

J

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

City, State

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE

 

LOAD (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

E-MAIL ADDRESS

 

 

 

 

 

SUMMER (kW)

 

 

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____

In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCRIPTIN OF WORK

 

 

N

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

DATA RECEIVED

DESIGNER

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

T

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NUMBER

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER ____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-

 

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Demand)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load

 

 

 

 

 

 

estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,

 

 

 

 

 

 

based on actual usage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

CTs-

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________

 

 

Taps Only

 

 

See Job # ________________________________

 

Indoo

Outdoor

 

On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above

 

 

 

 

 

 

 

 

 

 

r

 

 

 

 

 

Ground

 

 

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

Underwriter’s Cert.

 

Yes

No

 

 

 

 

 

 

 

 

 

Advance Billing

Yes

 

$_______________

Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required

 

 

 

__

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer

 

 

Permit Required

 

Yes

No

State

Other

 

 

 

 

 

 

 

Charges:

$_______________

 

 

 

 

 

 

 

 

 

 

 

__

 

 

 

 

 

 

 

 

_______________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cust. #

 

 

Date

 

 

ACT 222 Cert. Required

 

Yes #

 

 

No

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_________________________

 

___________________________

 

 

 

_____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTCO #

 

 

Date

 

 

PA One Call #

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

___________________________

 

 

 

 

__________________________

 

 

 

 

 

 

 

CATV #

 

 

Date

 

 

Gas

BTCO

CATV

Other

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

 

 

 

 

 

___________________

__________________________

 

 

 

 

 

 

 

 

Other

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

__________________________

 

___________________________

SKETCH / INSTRUCTIONS

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA COUNTY

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

830 S. Schuylkill Ave.

1050 W. Swedesford Rd.

 

COUNTIES

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

Philadelphia, PA 19146

Berwyn, PA 19312

 

400 Park Ave.

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

Email:PhilaNewBusiness@ex

Email:DelChesterServiceApplications@exe

Warminster, PA 18974

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

eloncorp.com

 

 

loncorp.com

 

 

 

Email:Bucksmontserviceapplications@e

 

Warminster, PA 18974

 

 

 

Fax # (215) 731-2327

Fax # (610) 725-1416

 

xeloncorp.com

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

Tax ID # or SSN

 

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

** ADDRESS TO BE SERVED

 

 

APARTMENT/LOT #

 

 

 

Separation of Wiring

Service Relocation

 

 

Service)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

If Applicable

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**

Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

3

 

 

 

 

 

 

 

-OR-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

3

 

 

120/240

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

3

 

 

120/208

 

4

 

 

CITY, STATE

 

ZIP CODE

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

3

 

 

277/480

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

3

 

 

13200

 

3 or 4

 

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

3

 

 

33000

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

METER INFO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

Multiple Meter Total No. _____________

ADDRESS

 

 

 

 

Reply Requested by:

 

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

/

 

 

Central Air _____ Tons

 

Resistance

 

 

 

 

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

TELE. #

 

 

 

 

E-MAIL ADDRESS #

 

 

 

 

 

TYPE

 

LOAD (kW)

 

SUMMER (kW)

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____  In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCIPTION OF WORK:

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

 

DATA RECEIVED

DESIGNER

 

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

 

T NUMBER

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

 

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-Demand)

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for

 

 

 

 

 

 

 

 

 

 

the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

 

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

 

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

 

CTs- ________

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

Indoor Outdoor

On ________

Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground

Taps Only

 

 

See Job # _________________________________

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

 

 

 

 

Underwriter’s Cert. Required

 

Yes

No

 

 

 

 

 

 

 

Advance Billing Required Yes

 

 

$_________________

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer Charges: $_________________

Permit Required

 

 

 

Yes

No

State

Other _______________________

Cust. # _________________________

Date ___________________________

ACT 222 Cert. Required

 

Yes # _____________

No

N/A

 

 

 

 

BTCO # ________________________

Date ___________________________

PA One Call # ___________________________

 

 

Date __________________________

CATV # ________________________

Date ___________________________

Gas

BTCO

CATV

Other ___________________

Date __________________________

Other __________________________

Date ___________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SKETCH / INSTRUCTIONS

Form Breakdown

Fact Name Fact Details
Form Identification The PECO Service and Meter Application form is identified as M-24175 with a revision date of 5/18.
Application Requirements Applicants must provide detailed information including customer name, service location, billing address, electrician or builder details, construction status, and specifics of the service and meter requirements.
Service Types and Characteristics The form accommodates various requests such as new service, load increase/decrease, service reintroduction, temporary service, and more, alongside details of the service characteristics like phase, volts, and wires.
Governing Law(s) for Service in Philadelphia Applications within the City of Philadelphia may be shared with Licenses & Inspections, and all work must comply with PECO Electric Service Requirements manual, inspected by an approved agency, showcasing the localized regulatory considerations.

Peco Service And Meter Application - Usage Guide

After you have received your PECO Service and Meter Application form, it's important to carefully complete it to ensure your electric service needs are accurately processed without unnecessary delays. This form is used to request new services, changes, or updates to existing services. Below are detailed instructions on how to fill out the form correctly. Once completed, the form should be sent to the appropriate PECO regional office specified on the form, ensuring all required documentation and plans are included. Processing times can vary, so submitting your form as early as possible is recommended.

  1. Begin by reading the instructions at the top of the form to get an overview of the application process.
  2. Identify the PECO regional office responsible for the area where the service is requested. Select the correct regional office box and prepare to send or fax your completed application to that office.
  3. Enter the customer's name and service location under section B. Be sure to include the Driver's License Number or Social Security Number as required.
  4. If applicable, include the PECO Energy pole # and/or Lot # in the designated area.
  5. For the customer's PECO billing address or the account number, complete the fields in section C, ensuring the information is from within the last 60 days.
  6. Fill out the contact information for the electrician or contractor in section D, including the Tax Identification number. Specify where replies should be sent and the desired date for the reply.
  7. Under section E, describe the current construction status and the date when PECO service is requested.
  8. Sections F through J cover the type of request, type of service, service characteristics, meter information, and heating/air conditioning details. Fill in each part accurately.
  9. For the load characteristics table in section K, provide the connected KW, maximum summer KW demand, and maximum winter KW demand for each type of load applicable.
  10. Complete the motor information table in section L, including details about the largest motor specifications.
  11. If compensated metering is to be used, indicate the totalizer and general load (KW) in section M.
  12. Include any additional comments that might help clarify your request in section N.
  13. Ensure the application is signed and dated in section O.

After filling out the form, double-check all sections for accuracy and completeness. Incomplete information may cause delays, so review your application carefully before submission. Include any additional required documents, such as site plans or diagrams, as specified in the form instructions. Once everything is in order, send the form and attachments to the PECO regional office you identified in step 2. Keeping a copy of the completed form for your records is advisable.

More About Peco Service And Meter Application

How do I select the correct PECO regional office for submitting my application?

To select the correct PECO regional office, first refer to the top section of the PECO Service and Meter Application form. There, you will find a list of regional offices categorized by geographical area. Identify the area in which the electric service is requested, and then check the corresponding box on the form. Each listed office covers specific counties or areas, so be sure to send or fax your completed application to the office responsible for the service location you're requesting.

What information is needed for the customer and service location section?

In this section, you will need to fill out the customer's name and the specific location where the service is requested. It is now mandatory to include the customer's Driver's License Number or Social Security Number. If you have a PECO Energy pole number and/or lot number, include this information only if it's applicable to your service request. For an underwriter's inspection, remember to use the service location address. This detail helps in clearly identifying the service site for PECO and ensures accurate processing of your application.

What should I do if my request involves a demolition?

If your service request involves demolishing a building and requires PECO to remove electric or gas facilities, you must call 8-1-1 for a PA ONE CALL demolition request. PA ONE CALL is a safety and communication system designed to prevent damage to underground utilities during excavation activities. This step is crucial for ensuring the safety of the demolition process and prevents accidental damage to utility lines, which could lead to service disruptions or safety hazards.

Is a credit application and agreement necessary for all service requests?

A credit application and agreement must be completed if you have not had PECO service within the last 60 days. This requirement ensures that PECO has up-to-date credit information for billing purposes. If no further communication is received from the customer within 90 days of PECO's response to the service request, PECO reserves the right to cancel the request. This policy helps manage and prioritize service requests efficiently while ensuring that all customers receive timely service.

Common mistakes

Filling out the PECO Service and Meter Application form is an important step in ensuring your electric service needs are met accurately and efficiently. However, common mistakes can lead to delays. One common error is not selecting the correct PECO regional office to which the application should be sent. Each region has different requirements and failing to send your application to the correct office can result in unnecessary delays.

Another frequent oversight is not providing the required customer information accurately, including the customer's name, service location, and especially the requirement for a Driver's License Number or Social Security Number. Missing or incorrect information in these fields can significantly slow down the process.

Applicants often forget to complete the fields for their billing address or the PECO energy account number from the last 60 days, which is necessary to confirm your identity and billing history. Similarly, details pertaining to the electrician or contractor, such as the Tax Identification number and a preferred address for correspondence, are sometimes overlooked or incorrectly filled out.

Incorrect indication of the current construction status and the requested service date can lead to scheduling issues. Being specific about dates rather than using vague terms can help PECO better accommodate your service request timelines.

Specifying the type of request, service, and meter information inaccurately can cause technical and logistical problems. It’s crucial to detail whether the service is for a new connection, upgrade, or change, as well as the specific requirements for the meter, such as single, dual, or multiple meter setups.

Failing to complete the load characteristics table with details like connected kW, maximum summer kW demand, and winter kW demand can lead to an underestimation or overestimation of your electrical needs. This mistake might result in improper service allocation or unexpected future adjustments.

Another common mistake is not including motor information or information about compensated metering if it will be used. Accurate details regarding totalizing meter setups and general load help in designing the right service for your needs.

Lastly, applicants often leave the application unsigned and undated, which automatically makes the application incomplete. A signature and date are necessary to verify the information and to initiate the processing of your application. Taking the time to review the form for these common errors before submission can facilitate a smoother and quicker service setup.

Documents used along the form

Completing the PECO Service and Meter Application is a significant step for those seeking to initiate or modify electricity service. However, this application often requires or is enhanced by additional documentation to ensure a smooth process and to meet all regulatory and company requirements. Understanding these forms and their purposes can notably streamline your dealings with PECO and other entities involved in providing utility services.

  • Credit Application and Agreement: This form is recommended if the customer has not had PECO service in the last 60 days. It assesses the creditworthiness of the applicant and outlines the terms of the service agreement, including payment obligations.
  • Underwriter's Inspection Certificate: Ensuring that electrical installations meet national and local safety standards is crucial. This certificate, issued after an inspection by an approved agency, confirms compliance and is often required before service can begin or be modified.
  • Site Plan: A detailed drawing showing the layout of the property, including the location of buildings and the proposed service entrance. This helps PECO determine the best way to connect the service and where to place meters.
  • Single Line Diagram: This technical drawing outlines the electrical distribution system from the utility connection to the main switchboard. It's vital for understanding how electricity will be distributed throughout the property.
  • Substation Arrangement: For larger projects requiring significant power, details of the substation's layout and its connection to the property might be needed. This includes transformer sizes and the arrangement of panels and switchgear.

While each document serves its unique purpose, from ensuring safety standards to defining technical specifications, they collectively contribute to a well-rounded application process. It's important to gather and understand these documents early on to avoid delays or complications. Whether you're a homeowner looking to establish new service or a contractor managing a large development, these supporting documents will help pave the way for a successful project completion.

Similar forms

One similar document is the utility initiation form used by gas companies. Like the PECO Service and Meter Application, this form gathers customer information for starting gas service, including customer identification and billing address. Both forms require technical details about the service needed, such as the type of service and specific requirements based on the property and planned usage. They both ensure that the service provided meets local regulations and the customer's needs.

The construction permit application form is another similar document. It also collects detailed information about a construction project, such as location, the contractor's details, and specifics about the planned construction. Just as the PECO form requires details about electric service needs for new or upgraded service connections, the construction permit focuses on the broader scope of building requirements and compliance with local building codes.

Another comparable document is the application for water service initiation. This form, similar to the PECO application, gathers customer and property information for the purpose of connecting to municipal or regional water services. It details the type of property being served and may require information on the expected water usage, just as the electric service application does for power needs.

The business license application shares similarities as well. It requires detailed information about the business, including its location, the type of business, and owner information. Comparable to the electric service application, it's a necessary step for establishing a legal utility or service requirement for a new or existing business, ensuring that all operations comply with local ordinances and regulations.

Telecommunications service applications resemble the PECO document in their collection of detailed customer and service information. They require specifics about the service requested, including location and technical needs, tailored to the installation of phone, internet, or other communication services. The focus is on ensuring that the technical capabilities match the customer's requirements while adhering to industry standards.

A zoning permit application is also akin to the PECO service and meter application in that it captures details about a property and its intended use to ensure compliance with local zoning laws. The specifics about the project or service need, similar to the electrical or construction details on the PECO form, help authorities determine if the proposed use aligns with zoning requirements.

An environmental compliance form, though more focused on environmental protection, collects detailed information about a project or operation similar to the PECO application. It examines the potential impacts on water, air, and soil, drawing parallels in the need to assess and mitigate any adverse effects that utility installations may have on the environment.

Lastly, the permit application for outdoor signs and fixtures shares similarities with the PECO application by requiring detailed information about the location, the type of installation, and technical specifications. Both forms are vital for ensuring that the installations meet specific safety and aesthetic standards set by local authorities.

Dos and Don'ts

When completing the PECO Service and Meter Application form, it is important to follow specific guidelines to ensure a smooth and efficient processing of your application. This list outlines a series of do's and don'ts that applicants should adhere to:

Do's:
  • Read the instructions carefully at the top of the application before beginning, to understand the overall process and requirements.
  • Identify and select the correct PECO regional office for where the service is requested, as this will expedite the handling of your application.
  • Complete all required fields with accurate information, including the customer's name, service location, and billing address or account number, to prevent any delays.
  • Include your Electrician/Builder Tax Identification number if you are the electrician or contractor filling out the form, as it is now a mandatory field.
  • Specify the date when you would like the PECO service to commence, avoiding vague terms like "as soon as possible," to facilitate scheduling.
  • Sign and date the application at the provided section (O), as an unsigned application may be considered incomplete and could delay processing.
Don'ts:
  • Do not skip the step to check the box indicating the PECO regional office where the service is requested, as failing to do so can result in your application being sent to the wrong office.
  • Avoid leaving fields blank, especially those that require personal identification information such as the Customer's Driver's License Number or Social Security Number, as this is essential for processing the application.
  • Don't forget to include additional requested details such as PECO Energy pole # and/or Lot #, and use the service address when applying for an underwriter's inspection if applicable.
  • Refrain from providing inaccurate or outdated contact information for yourself as the electrician or contractor. This could hinder PECO's ability to communicate effectively regarding the application.
  • Do not estimate or guess the load characteristics or motor information. Precise data is required for K, L, and M sections to ensure the correct service is provided.
  • Avoid delays in communication following the submission of your application. The company reserves the right to cancel requests if no further communication is received within 90 days of PECO's response.

Misconceptions

When navigating the process of applying for electric service and meter setup with PECO, applicants occasionally encounter misunderstandings. Addressing these misconceptions can streamline the application process and ensure a smoother experience. Here are ten common misconceptions and clarifications regarding the PECO Service and Meter Application form:

  • Any form of communication is acceptable for submitting the application. In reality, the form must be mailed or faxed to the specified regional office indicated on the form, ensuring it reaches the correct destination for processing.
  • Personal identification numbers are optional. Contrary to this belief, providing a Driver's License Number or Social Security Number is required for processing the application, ensuring the identity of the customer is verified for service setup.
  • Completing the electrician or contractor section is optional if you are a homeowner. This section must be completed regardless of who is submitting the form, requiring details of the electrician or contractor, including their Tax Identification number, to ensure accountability and compliance with electrical standards.
  • The form does not require a detailed description of electrical load characteristics. Detailed information regarding load characteristics and motor information must be provided to ensure the service setup meets the specific needs and safety requirements of the premises.
  • Immediate service connection is available. While applicants may request service "as soon as possible," an exact date for when service is needed helps PECO schedule connections more efficiently, avoiding unrealistic expectations of immediate service.
  • All service voltages are available everywhere. Service voltages vary by location, and information regarding service availability must be obtained from PECO before proceeding with electrical equipment installations or wiring.
  • Submission of the application automatically initiates service setup. Incomplete information or failure to comply with all requirements may lead to delays. Following up with PECO after submitting the application is crucial to ensure progress.
  • PECO determines the meter location. While PECO provides guidelines, the application must include proposed meter locations and any special installation requirements, subject to approval, to accommodate the specific conditions of the service site.
  • Approval is guaranteed once the application is submitted. The application is subject to review and must meet all PECO Electric Service Requirements and local inspections, which can affect the approval status and lead to adjustments or additional requirements.
  • Prior PECO service history is irrelevant to the application. If the customer has not had PECO service within the last 60 days, a credit application and agreement must be completed, highlighting the importance of disclosing previous service history to expedite the new service request.

Understanding and addressing these misconceptions can facilitate a smoother and more efficient service and meter application process with PECO, ensuring customers are well-informed and properly prepared for their electric service requirements.

Key takeaways

When applying for electric service and meter installation or changes with the PECO Service And Meter Application, understanding the process and requirements is crucial for a seamless experience. Here are key takeaways to consider:

  • Identify the PECO regional office based on the location where the service is requested, as the form needs to be sent to the correct office for processing.
  • Fill in the customer’s information thoroughly, including the name, service location, and a Driver's License Number or Social Security Number. This information is crucial for identification and future correspondence.
  • Include the PECO billing address or account number if the customer has had PECO service within the last 60 days. This helps in speeding up the application process.
  • For contractors or electricians, providing your Tax Identification number is now a requirement, along with details on where the reply should be sent.
  • Clearly indicate the current construction status and the date by which PECO service is requested to help coordinate the service start date effectively.
  • Detail the type of request, service, service characteristics, and meter information, including heating and air conditioning specifics. This information is essential for PECO to understand your needs and provide accurate service.
  • Complete the sections regarding load characteristics and motor information if applicable. Accurate information helps in providing appropriate equipment and service.
  • The form must be signed and dated by the individual submitting the request. An unsigned form may result in processing delays.

Additionally, it's important to note that all work must comply with PECO Electric Service Requirements and be inspected by an approved agency. Service voltages vary by area, so it's recommended to confirm the service availability and meter location with PECO ahead of any major purchases or construction. Finally, if you haven't had PECO service in the last 60 days, completing a credit application and agreement will be required.

Remember, incomplete information can delay the processing of your application, so ensure every section is completed accurately. If demolishing a building and needing PECO to remove electric or gas facilities, contact PA ONE CALL. Always keep open communication with PECO, especially if there are updates or changes to your application details.

Please rate Fill Out a Valid Peco Service And Meter Application Form Form
3.5
(Lovely)
2 Votes

Fill out Other Documents